Belt Conveyor
Liên hệ
- Tình trạng:
- Nhận đặt hàng
1. Optimal line up of various conveyors
Conveyors include roller conveyors, belt conveyors, chain conveyors, round belt conveyors, drive conveyors, and many other conveyor types.Optimum line design is the most important point according to the goods to be transported, the condition of the site, the speed of logistics.There are also many examples that the conveyor line of the corner is returned and it becomes a stumbling block of the work on site by doing the mistaken conveyor choice at one place.Jaroc designs the most suitable conveyor line for customer's site with a lot of experience and experience.
2. Using overhead conveyance, vertical conveyance, and inclined conveyance
The drawback of the conveyor line is that there is a high possibility of dividing the golden space on the ground.Even if there is no problem with this line design now, there is also the possibility of becoming a stumbling block for future layout change. we do not lay ground conveyor lines in the golden space as much as possible, and designs the line effectively by using the ceiling space etc effectively.
3. After Maintenance Service
After delivering the conveyor line system, after-sales service after delivery is also an important factor.
We makes after-maintenance service possible (compatible with pay maintenance).Maintenance of existing conveyor lines can also be handled. Please do not hesitate to contact us · Please contact us.
The use |
・As a conveyor for buckets, pallets, goods |
---|---|
Features |
・From arrival to receipt ~ storage ~ picking ~ delivery ~ shipping, planning, designing, manufacturing, construction the optimum conveyor line. |
Attention |
Some products can not be conveyed by conveyor depending on product, installation location. |
1. How much time do you need to quote?
Unless the product has a very specific construction usually a quotation for a mold is send the next day after we receive enquiry with all the necessary details
2. I would like to get a quotation but the product is not yet protected by patent. Can you guaranty that my idea will be sufficiently protected if I send it to you?
If you feel uncomfortable about protection of your idea, we can sign a non-disclosure agreement before you send us any data.
3. What do you need to make a quotation?
To make a quotation, which will be adequate and sufficiently competitive, we need 3 things:
a. Product drawing or 3D model data file or product sample. If none of these are available, we need at least an ordinary sketch with the most critical dimensions of the product on it.
b. What Kind of plastic resin you are going to use in manufacturing or an idea of the durability of the product (what the product is or does).
c. Estimated quantity of the product needed in a period of time (i.e. one month) and the idea of how many products in total you are going to make (estimated total sales).
4. How long does it take to build an injection mold?
It varies a little depending on product size and complexity of its shape, but generally in case of DML, a middle size molds are built in 30 days lead time
5. I would like to have my mold built faster than you quoted. Is it possible?
DML’s mold building lead-time does not belong to the lengthy ones. On special request from clients and depending on our work load it is some times possible to make mold faster though the advancement cannot be big, just a few days.
6. Is it possible without a visit in your company to know whether my mold is being built on schedule?
On client’s requests we are giving a detailed mold-building schedule and send weekly reports. The reports may have digital pictures that show the progress of work.
Other question:
1. Are you Factory or Trading company?
We are factory, so our price is very competitive ex-factory price and you are welcome to visit the factory
2. How about the quality of your product?
100% inspection during production
3. What kind of machining service do you have?
Grinding, Machining, CNC milling and turning, CNC milling, CNC metal, grinding, stamping, casting and forging parts, assembly service.
4. What material can you supply?
Carbon Steel, Alloy Steel, Stainless Steel, Brass, Copper or according to your requirement.
5. What’s the delivery time?
For products in stock, within 5 days after receiving your payment.For custom order, about 15-30 days after confirmed every details
6. What’s your packing?
Our Normal packing is PE foam, outside carton box or customized.
7. What about the warranty?
We are very confident in our products, and we pack them very well with PE Foam and carton box to make sure the goods in well protection.